Infrastructure Completed 2023

Strategic Military Infrastructure: Army Hanger 04

High-tensile steel solutions designed for rapid deployment, blast resistance, and maximum durability in extreme environments.

square_foot

Square Footage

45,000 sq ft

schedule

Completion Time

8 Months

weight

Load Capacity

120 Tons

shield

Steel Grade

HT-5000

The Challenge

Engineering for Blast Resistance & Speed

The Army Hanger 04 project required a blast-resistant framework capable of housing heavy-lift aircraft. The primary challenge was the stringent timeline combined with the need for specialized foundation work in unstable soil conditions.

JWS GROUP delivered a custom-engineered solution that exceeds standard military safety protocols while maintaining operational efficiency. Our team utilized pre-fabricated modular steel sections to reduce on-site assembly time by 40%.

engineering

Custom Fabrication

Tailored steel components manufactured off-site for precision fit.

thermostat

Thermal Regulation

Advanced insulation systems maintaining operational temps in extreme heat.

security

Blast Protection

Reinforced structural nodes designed to dissipate shockwaves.

speed

Rapid Deployment

Streamlined assembly process allowing 24/7 construction cycles.

play_arrow
Construction workers welding high tensile steel beams on the hanger roof

Phase 2 Construction: Structural Framing

Time-lapse coverage of main span erection.

Project Gallery

Main Structure Assembly

On-Site Welding

Structural Framework

Technical Specifications

REF: JWS-AH-04-SPEC
Primary Material ASTM A992 Structural Steel
Roof System Standing Seam Metal Roof (24 Gauge)
Foundation Type Reinforced Concrete Slab (High Load)
Wind Load Rating 150 MPH
Seismic Category Category D
format_quote
"The speed at which JWS GROUP mobilized and executed this project was unprecedented. The structural integrity meets our most rigorous standards."
Colonel James R. Sterling Director of Infrastructure, Base Operations